Self-build home: Prepare a concept design
Introduction.
In this stage, we attribute design activities to ‘designers’. These may be architects and engineers, a design and build contractor, or a kit house supplier. If a kit house supplier is only supplying the house itself, additional design consultants may be required.
Concept design is the first design stage. Some designers will differentiate between 'concept design' and 'scheme design'. In this case, the 'concept' is the initial design idea (or outline design), whereas the 'scheme' develops the concept, taking on board more functional and practical considerations.
It may be necessary for designers to undertake site surveys and other site appraisals before starting the concept design, for example, digging trial pits before designing foundations.
Design is an iterative and collaborative process, it requires close involvement of all those with an interest in the completed home. This is important not only to ensure a suitable design is developed, but also to make certain that everyone has ‘bought into’ the design and it is not just one person’s vision.
Developing the brief.
It is likely that the project brief will continue to develop as the concept design is prepared. It is important that these developing requirements are written down so there is a record of what has been agreed. Development of the brief might include:
- Preferred style and materials.
- Requirement for spaces to be open plan or enclosed.
- Ability to operate parts of the building separately (for example an office, children’s areas or guest rooms).
- Sound insulation and sound absorption requirements.
- Provision of en-suite or shared bathrooms, dressing rooms and so on.
- Accessibility requirements for people with disabilities or impaired mobility.
- Access to and views of gardens and the surrounding landscape.
- Entry spaces and reception spaces.
- Fireplaces, wood burning stoves and so on.
- Hard v soft floor coverings.
- Security, intruder alarms, cctv, door and gate entry systems and post facilities.
- Audio visual, ICT, entertainment and other equipment requirements.
- Specialist requirements for finishes, fixtures and fittings.
- Orientation in relation to the sun, prevailing winds and views.
- Natural lighting.
- Artificial lighting (general and feature) and controls.
- Comfort conditions (radiant temperature, air temperature, natural and mechanical ventilation and so on).
- Storage requirements and utility rooms.
- Internal and external waste storage and collection.
- The possibility of including enabling works for future extensions.
- Galleries and balconies.
- External landscaping such as; planting, seating areas, drainage, sprinklers and taps, lighting and power, paths, screens, fences, walls, shading and so on.
Developing the concept design.
The concept design should develop to include:
- A site plan, including; access, car parking, hard surfaces, landscape, water features, art and so on.
- Floor plans, sections and elevations.
- Analysis of the relationships between related functions.
- Building services strategy (heating, ventilation, electrical supply, lighting and so on).
- Outline specification describing the main materials and workmanship required.
- Schedules of accommodation.
- A strategy for obtaining planning permission.
- Procurement strategy.
- Programme, construction methodology and logistics.
- Approximate quantities of the main materials proposed.
- A cost plan (including site preliminaries).
This information should be co-ordinated and issued at the end of the stage for comment or approval before the project proceeds to detailed design or a planning application is submitted.
The brief should be frozen at the end of the concept design stage and any subsequent changes that materially alter the cost should be carefully considered by the self builder for approval or rejection.
Featured articles and news
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Ireland's National Residential Retrofit Plan
Staged initiatives introduced step by step.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.
Reflecting on the work of the CIOB Academy
Looking back on 2025 and where it's going next.
Procurement in construction: Knowledge hub
Brief, overview, key articles and over 1000 more covering procurement.
Sir John Betjeman’s love of Victorian church architecture.
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.
BSR as a standalone body; statements, key roles, context
Statements from key figures in key and changing roles.
ECA launches Welsh Election Manifesto
ECA calls on political parties at 100 day milestone to the Senedd elections.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.